DEM Simulation — Particle Velocity Visualization

Figure 1: DEM Simulation — Transfer Point TP-13 — Conveyor BC-12A feeding to Conveyor 13B | Velocity: 0.00 to 6.00 m/s | Belt Capacity: 1,400 TPH
0.00 m/s
Static / Belt
1.00 m/s
Low Velocity
2.00 m/s
Low-Mid
3.00 m/s
Moderate
4.00 m/s
High Velocity
5.0–6.0 m/s
Peak / Impact

System Details & Operating Parameters

ParameterDischarge Conveyor (BC-12A)Feeding Conveyor (13B)Unit
Bulk MaterialCoalCoal—
Belt Speed3.43.4m/s
Belt Capacity1,4001,400TPH
Transfer Point IDTP-13—
Chute OrientationNear-vertical drop chute—
Velocity Range Captured0.006.00m/s
Analysis SoftwareEDEM (DEM Solutions)—

Executive Summary

This case study presents a Discrete Element Method (DEM) simulation study of Transfer Point TP-13, the chute system connecting the BC-12A discharge conveyor to the 13B feeding conveyor. The analysis was performed using EDEM software to evaluate bulk coal material flow behavior, verify particle trajectory through the curved chute geometry, identify high-velocity impact zones, and assess the overall operational stability of the transfer point design at the rated capacity of 1,400 TPH.

The DEM simulation demonstrates a steep, vertically-oriented transfer chute carrying coal from the BC-12A conveyor down through a near-vertical drop into the 13B conveyor below. Particle velocity distributions are captured using the EDEM solver with a velocity color-map ranging from 0.00 m/s to 6.00 m/s.

Overall Performance Rating
8.0 / 10 — Operationally Stable

Study Objectives

The DEM simulation study of Transfer Point TP-13 was conducted with the following primary objectives:

Evaluate bulk coal flow behavior through the TP-13 vertical drop chute geometry
Verify controlled transition of material from BC-12A discharge to 13B feeding conveyor
Quantify particle acceleration and peak impact velocity within the near-vertical fall section
Identify high-velocity impact zones at the base of the drop chute and on the 13B belt
Assess potential for excessive particle rebound, scatter, and dust generation at the impact point
Verify belt loading distribution and centering on the 13B receiving conveyor
Confirm the transfer point is capable of sustaining the rated capacity of 1,400 TPH
Provide engineering recommendations for wear protection and impact energy dissipation

DEM Simulation Observations

1

Stable Transport on BC-12A Approach Belt

Coal particles travel along the BC-12A conveyor at a stable, low velocity matching the belt speed of 3.4 m/s. The yellow-green coloration on the approach belt confirms uniform, well-distributed material transport with no evidence of surging or uneven loading prior to entering the drop chute.

Pass
2

Significant Particle Acceleration in Vertical Drop

As material enters the near-vertical drop chute, particles accelerate rapidly under gravity. The velocity color-map shows a clear progression from green/yellow (2.0–3.0 m/s) near the top of the chute to deep red (5.0–6.0 m/s) in the lower section, confirming significant free-fall acceleration through the steep transfer geometry.

Warning
3

Peak Impact Zone at Lower Chute Wall

The highest particle velocities (5.0–6.0 m/s, red zone) are concentrated along the lower section of the drop chute where the accelerated material stream strikes the chute wall before redirecting toward Conveyor 13B. This concentrated impact region is the primary wear-critical zone identified in the simulation and requires targeted wear protection.

Critical
4

Controlled Discharge onto Conveyor 13B

Following impact and redirection at the base of the drop chute, the material decelerates and settles onto Conveyor 13B with a yellow-green particle distribution indicating near-belt-speed loading (approximately 3.4 m/s). The loading pattern appears centrally distributed across the 13B belt width, consistent with a properly aligned discharge geometry.

Pass

Velocity Analysis — Particle Velocity Profile

The EDEM simulation captures particle velocities across the full TP-13 transfer path, from the BC-12A approach belt through the vertical drop chute to the 13B receiving belt. The velocity color-map (0.00 – 6.00 m/s) reveals a clear acceleration profile driven by the near-vertical chute geometry.

BC-12A Belt (Approach)
3.4 m/s Matches belt design speed
Chute Entry (Top of Drop)
2.0–3.0 m/s Initial acceleration begins
Mid Drop Chute
3.5–4.5 m/s Continued free-fall acceleration
Lower Chute / Impact Wall
5.0–6.0 m/s Peak velocity — primary wear zone
13B Belt Loading Point
≈ 3.4 m/s Decelerated to belt speed — stable

Performance Evaluation Matrix

Material Flow Continuity
Excellent
9.0 / 10
Approach Belt Loading (BC-12A)
Stable / Uniform
9.0 / 10
Chute Blockage Risk
Very Low
9.5 / 10
Particle Acceleration Control
Moderate — High Free-Fall
6.0 / 10
Impact Wear Risk (Lower Chute)
High at Peak Zone
5.5 / 10
Discharge Loading (13B)
Good — Centralized
8.0 / 10
Dust Generation Potential
Moderate
7.0 / 10
Operational Stability
Stable
8.5 / 10
OVERALL PERFORMANCE RATING — Operationally Stable 8.0 / 10

Problem Statement & Root Cause Analysis

The DEM simulation of Transfer Point TP-13 was conducted to characterize particle behavior through the steep vertical drop geometry and to identify any operational or wear-related concerns prior to long-term service. The table below summarizes identified issues and their root causes:

Issue Root Cause Status (Current Design)
High particle impact velocityNear-vertical chute geometry permits unrestricted free-fall accelerationIdentified — liner protection required
Localized wear riskDirect high-velocity particle-wall impact at lower chutePending — AR liner installation
Moderate dust generationHigh-velocity impact at base of drop chutePending — skirt sealing recommended
Material build-up riskAdequate flow area through chute profileLow — no blockage observed
Belt loading uniformity (13B)Discharge geometry aligned with belt centerlineResolved — centralized loading
Approach belt stability (BC-12A)Consistent feed rate and belt speedResolved — stable transport

Engineering Recommendations

Wear Protection — High-Impact Liner Zone

Install heavy-duty abrasion-resistant (AR400/AR500 grade) ceramic or chromium carbide overlay liners at the following locations:

  • Lower chute impact wall (primary wear location — peak 6.0 m/s)
  • Mid-chute transition section (secondary wear zone — 3.5–4.5 m/s)
  • Conveyor 13B loading point and skirting region

Impact Energy Dissipation

Given the steep vertical drop and resulting high free-fall velocities, the following design features are recommended to reduce direct wall impact severity:

  • Consider a rock-box or dead-bed cushioning arrangement at the base of the drop chute
  • Evaluate a stepped or cascading chute profile to break the fall into shorter segments
  • Assess feasibility of a deflector plate to redirect flow before final impact

Maintenance Access — Inspection Doors

Incorporate hinged inspection doors to facilitate routine inspection and liner replacement without major dismantling at:

  • Upper chute section (entry zone from BC-12A)
  • Impact region at the lower chute wall
  • Loading zone above Conveyor 13B

Dust & Spillage Control

Given the moderate dust generation potential identified at the high-velocity impact zone, the following measures are recommended:

  • Install rubber skirting seals along Conveyor 13B loading zone (minimum 1.5 m length)
  • Seal all chute wall gaps and access openings to contain fine coal particles
  • Consider local dust suppression given the elevated impact velocity
  • Monitor spillage and dust levels during initial operation

Conclusion

The DEM simulation of Transfer Point TP-13, connecting the BC-12A discharge conveyor to the 13B feeding conveyor, was conducted using EDEM software at the specified operating parameters (3.4 m/s belt speed, 1,400 TPH belt capacity, coal bulk material).

Key findings confirm: (1) stable, uniform material transport on the BC-12A approach belt; (2) significant particle acceleration through the near-vertical drop chute, reaching peak velocities of 5.0–6.0 m/s; (3) a concentrated high-impact wear zone at the lower chute wall requiring abrasion-resistant liner protection; and (4) controlled, centralized discharge onto Conveyor 13B at near-belt-speed conditions. The overall performance rating of 8.0 / 10 confirms Transfer Point TP-13 is operationally stable and capable of sustaining the rated 1,400 TPH capacity.

Recommended Action
Implement abrasion-resistant wear liners and impact energy dissipation measures at the lower chute zone to enhance long-term service life and reduce planned maintenance intervals.